Invite People

Share 4Engineers with your friends and help them get started!

Emails
Enter multiple email addresses by separating it with a comma.
Back
4Engineers
· Chemical Engineering Online
AI summary

thyssenkrupp Uhde has been awarded pre-FEED contracts by Norway’s Fuella AS for two large-scale green ammonia projects in Brazil, located at the Ports of Pecém and Açu. The PeGA and AçuGA projects target about 400,000 tonnes per year of green ammonia production, per the provided excerpt.

Which end-use markets should these projects prioritize to maximize impact—fertilizer, marine fuel, or power generation—and why?

thyssenkrupp Uhde awarded pre-FEED contracts for two green-ammonia projects

This article was originally posted on chemengonline.com.

thyssenkrupp Uhde (Dortmund, Germany; www.thyssenkrupp-uhde.com) has been awarded the pre-FEED (front-end engineering and design) contracts by Fuella AS (Bergen, Norway; www.fuella.no) for the development of two large-scale green ammonia projects in the Port of Pecém, Brazil and the Port of Açu, Brazil. The PeGA and AçuGA projects target the production of 400,000 tonnes per annum […]

The post thyssenkrupp Uhde awarded pre-FEED contracts for two green-ammonia projects appeared first on Chemical Engineering.

Login to comment

Login
Discussion

1 comment

Collapse this comment
pat 2 months ago
400 ktpa NH3 takes roughly 3.5 to 4.5 TWh per year of clean power and about 0.6 to 1.0 million m3 per year of ultrapure water just for the hydrogen. Are Pecém and Açu getting dedicated wind or solar with on-site RO, or leaning on the grid? Also, plan for enough refrigerated storage (around 120 kt total) and a relief system sized for boil-off; we see nasty summer BOG spikes in Houston.
Report content
Reason Description