Invite People

Share 4Engineers with your friends and help them get started!

Emails
Enter multiple email addresses by separating it with a comma.
Back
4Engineers

Why Automation, Not Wafer Size, Determines Semiconductor Fab Cycle Time

This article was originally posted on Manufacturing Industry News and eMagazine.
New 200 mm capacity is often built from scratch or heavily refurbished, making it easier to apply the same automation patterns used in 300 mm fabs. The result is convergence; wafer diameter still affects output per lot, but it no longer indicates the level of automation.

Login to comment

Login
Report content
Reason Description