Invite People

Share 4Engineers with your friends and help them get started!

Emails
Enter multiple email addresses by separating it with a comma.
Back
4Engineers
· Chemical Engineering Online
AI summary

Ansaldo Green Tech has completed a high-volume production line for AEM electrolyzer stacks at its Genoa, Italy facility, with a capacity exceeding 300 MW per year. The expansion marks a key step in industrializing the company’s electrolyzer technology and reinforces the industrial footprint of the Ansaldo Energia Group.

What impact could this >300 MW/year AEM electrolyzer capacity have on scaling green hydrogen projects and reducing costs in Europe?

Ansaldo Green Tech completes large-volume production line for AEM electrolyzers

This article was originally posted on chemengonline.com.

Ansaldo Green Tech S.p.A. (Genoa, Italy) has completed its new high-volume production line for AEM (anion exchange membrane) electrolyzer stacks at its Genoa facility. With a production capacity exceeding 300 MW per year, the plant marks a significant step in the industrialization of Ansaldo Green Tech’s electrolyzer technology, reinforcing Ansaldo Energia Group’s S.p.A. industrial footprint […]

The post Ansaldo Green Tech completes large-volume production line for AEM electrolyzers appeared first on Chemical Engineering.

Login to comment

Login
Report content
Reason Description