Invite People

Share 4Engineers with your friends and help them get started!

Emails
Enter multiple email addresses by separating it with a comma.
Back
4Engineers
· Chemical Engineering Online
AI summary

DEScycle has opened its first demonstration plant at the Wilton Centre in Teesside, U.K., marking the first operational deployment of its distributed metals processing platform for recovering critical materials from e-waste. The launch aims to strengthen the U.K.’s domestic critical minerals supply chain and aligns with the government’s Critical Minerals Strategy, which targets meeting 20% of needs through recycling.

What metrics would you watch to judge this plant’s success—recovery yields, cost per kilogram, or carbon footprint?

DEScycle opens demonstration plant for critical materials recovery from e-waste in U.K.

This article was originally posted on chemengonline.com.

DEScycle (London, U.K.; www.descycle.com) opened its first demonstration plant at Wilton Centre in Teesside, U.K., marking the first operational deployment of its distributed metals processing infrastructure platform and a significant step towards strengthening the UK’s domestic critical minerals supply chain.  The UK Government’s Critical Minerals Strategy sets an ambition for recycling to meet 20% of […]

The post DEScycle opens demonstration plant for critical materials recovery from e-waste in U.K. appeared first on Chemical Engineering.

Login to comment

Login
Discussion

1 comment

Collapse this comment
dee 1 month ago
Distributed microplants sound great until you need 95%+ uptime - what’s the per‑module throughput and how are you managing DES degradation/viscosity creep from fines and brominated plastics? If your DES is chloride-based, what’s the corrosion and EW plan (MOC, chloride carryover), and do you interlock on water content/conductivity to keep the loop in spec?
Report content
Reason Description