INEOS (London, U.K.; www.ineos.com) has taken delivery of the first of the last two modules, at the Port of Antwerp, to complete the Project ONE (project-one.ineos.com) cracker. The modules were built in Abu Dhabi, but their transport to Antwerp was disrupted by the war in Iran and the blockade of the Strait of Hormuz. After […]
The post INEOS takes delivery of module delayed by war in Iran appeared first on Chemical Engineering.
Login to comment
Login3 Replies
0 Replies
0 Replies
1 Replies
1 Replies
0 Replies
0 Replies
0 Replies
0 Replies
0 Replies
0 Replies
0 Replies
0 Replies
0 Replies
0 Replies