At our Louisville plant we recently revamped a Class I, Div 1 drum line for flammable blends. We swapped floor scales and manual valves for Coriolis-based, bottom-up semi-auto fillers with a two-stage profile, nitrogen blanket, and bonded/grounded swivels. Result: cycle time per 55-gal dropped 21% (73s to 58s), giveaway fell from 0.15% to 0.08%, and vapor exposure is noticeably lower because we stay closed until bung torque.
Not all roses: entrained air on solvent returns confused the meters until we added backpressure control and a short recirc loop. We fought with load certs too; customers buying by weight still want legal-for-trade evidence, and many C1D1 Coriolis packages aren’t NTEP certified. Static control and hose resistance per NFPA 77 mattered more than the brochure suggests.
For folks in oil and petrochemical terminals: have you made the same shift from weigh-scale to mass flow on drums or totes? What tripped you up in C1D1, and would you do it again?
On the certification question: you need two separate approvals on the same meter configuration, and vendors often have one without the other.
1. Weights and measures: in the US that is an NTEP Certificate of Conformance evaluated against NIST Handbook 44, Section 3.37 (Mass Flow Meters). The NCWM publishes a searchable CoC database, so you can check by device type and manufacturer instead of relying on the brochure. Read the CoC limitations closely: approved products, minimum delivery, flow range, and whether it covers the transmitter and the meter together. Internationally the equivalent is OIML R 117 for dynamic measuring systems for liquids other than water. 2. Hazardous location: the Class I, Div 1 (or Zone 1) listing is a separate certificate, and it has to match the same sensor, transmitter, and housing combination that is on the NTEP certificate.
Ask the vendor for both certificate numbers for the exact model code you are buying. If they can't give both, your current approach of controlling the fill with the Coriolis and issuing the legal ticket from the NTEP floor scale is a sound design, not a workaround. It also gives you a running meter-versus-scale comparison that catches entrained-air errors early.
We made the same shift on a solvent-borne adhesives line and kept customers satisfied on custody by controlling with Coriolis but issuing the legal ticket from a C1D1 NTEP floor scale downstream; it also flagged the occasional aeration blip. C1D1 pain points were transmitter purging and static, so we used a Z-purged panel tied to a fill permissive and monitored bonding/grounding clamps with a below-10-ohm interlock, plus quarterly hose resistance checks per NFPA 77. Have you found any Coriolis packages with OIML/NTEP for flammables, or is dual-verify your long-term plan?
1. Weights and measures: in the US that is an NTEP Certificate of Conformance evaluated against NIST Handbook 44, Section 3.37 (Mass Flow Meters). The NCWM publishes a searchable CoC database, so you can check by device type and manufacturer instead of relying on the brochure. Read the CoC limitations closely: approved products, minimum delivery, flow range, and whether it covers the transmitter and the meter together. Internationally the equivalent is OIML R 117 for dynamic measuring systems for liquids other than water.
2. Hazardous location: the Class I, Div 1 (or Zone 1) listing is a separate certificate, and it has to match the same sensor, transmitter, and housing combination that is on the NTEP certificate.
Ask the vendor for both certificate numbers for the exact model code you are buying. If they can't give both, your current approach of controlling the fill with the Coriolis and issuing the legal ticket from the NTEP floor scale is a sound design, not a workaround. It also gives you a running meter-versus-scale comparison that catches entrained-air errors early.